Refinery vegetable oils and fats Zaanstreek
Lasmotec has installed the completely connecting piping in a new refinery, from utility to product pipelines. The new factory is also equipped with steam, water,gas and we have made an infringement in the current factory for connection. In addition, pipe bridges have been built, components have been connected, and piping has been installed up to DN800. Parallel to this project, we have installed the cooling installation for this factory through another client.