Hygear Product piping installation

Lasmotec has prefabricated a pipe bridge in its workshop. The included pipes that have already been installed in advance consist of 2 ice water pipes DN300, schedule 40 DN150 steam, natural gas, water, compressed air and condensate pipes. The pipeline bridge has been transported in its entirety to the final destination in two parts.

Passion, development and quality leads to the best result

Fonterra Heerenveen
Ice rink de Meent