Pave II Leeuwarden
In 2015, Lasmotec was commissioned to build two DN350 steam main pipes from the existing utility building to the new dairy factory. After this first assignment, Lasmotec obtained various other assignments for the installation of;
-
Steam and condensate distribution in the new factory, Ranging from DN 250 to DN 15 pipes.
• Air pipes through the factory.
• Complete NH3 / ice water installation for the cooling of the factory.
• Ice water tank of 88m3, which is prefabbed at Lasmotec in the workshop and with 1 assembly weld placed at the final location.
• Ice water distribution by the factory to the users.
• The entire CIP kitchen with water distribution. Various manifolds prefab prepared in Surhuisterveen after which everything was transported to the end location.
The total lead time for Lasmotec was almost 2 years.