Flowfirm pipe bridge
Lasmotec has prefabricated a pipe bridge in its workshop. The included pipes that have already been installed in advance consist of 2 ice water pipes DN300, schedule 40 DN150 steam, natural gas, water, compressed air and condensate pipes. The pipeline bridge has been transported in its entirety to the final destination in two parts.